News
Fashola: We’re building three flyovers, interchange to decongest Lagos-Ibadan Expressway
The Federal Government is collaborating with Ogun State Government to secure the Right of Way (RoW) for the construction of three bridges and an interchange on the Lagos-Ibadan Expressway.
Minister of Works and Housing, Mr Babatunde Fashola (SAN), said this during an inspection of the highway on Wednesday.
Fashola, who was joined by Governor Dapo Abiodun of Ogun State at the Lotto Bridge under construction, said the highway accommodates over 40,000 vehicles daily, hence the urgent need for additional flyovers and interchanges for decongestion.
The bridges are under construction at Makun, MFM and Lotto (Mowe) areas on the Lagos-Ibadan expressway.
“So that what used to cause the congestion is limited to the barest minimum if not totally eradicated when the road is finished.
“So, we now require additional land to build the interchange, that is why I called the governor (Dapo Abiodun),” he said.
He said that the Buhari administration inherited several stalled projects which he was committed to completing by adequately funding the projects
Fashola expressed satisfaction with progress of work on the ongoing reconstruction/rehabilitation of the Lagos-Ibadan Expressway.
On his part, Abiodun assured that the state government would give all the land and support needed.
Earlier, the Federal Controller of Works in Lagos, Mr Olukayode Popoola, gave the measurements and dimensions needed for the bridges and interchange.
Popoola also gave details on the number of buildings and services on the Right of Way of the bridges which, without paying compensations, would stall the project.
He said that section one of the Lagos-Ibadan Expressway project, which spans from Ojota in Lagos to Sagamu Interchange “has achieved 56 per cent completion”.
Also, during inspection of section two of the project, which spans from the Sagamu Interchange to Ojoo in Ibadan, the Federal Controller of Works in Ogun, Mr Umar Bakare, said that the section was 63 per cent completed.
Conducting the minister through the site, Bakare assured that all the challenges slowing down the project around the Ogere axis had been dealt with, helping construction get to final layer on several portions.
He also showed the minister the Ajebo flyover destroyed by an articulated vehicle carrying an escavator higher than the head room of the bridge.
-
Society News3 years ago
Jamaican man beheads wife after finding out their 6 kids are not his
-
Society News5 years ago
EXCLUSIVE: The Complete Story of Dolapo Awosika, John Fashanu and Prophet Kasali Sex Mess
-
News2 years ago
Breaking: Ex-Police IG, Tafa Balogun Dies
-
News4 years ago
Pastor Osagie Ize-Iyamu, His Membership Of Secret Cult, And Other Issues Touching On His Public Credentials Examined by Barr. PATRICK I. BIOSE
-
News4 years ago
BREAKING: Ajimobi’s daughter-in-law blast Gov. Makinde, says gov can’t surpass ex-Oyo gov
-
News4 years ago
BREAKING: 2 arrested as NAF begins investigations into Tolulope’s death
-
News4 years ago
BREAKING: Police take over Edo House of Assembly as APC, Oshiomhole move to seize control
-
Crime4 years ago
Exclusive: Female Aide Fingered In Oko Oloyun’s Murder + Banking Transactions That Nailed Husband
Notice: Undefined variable: user_ID in /var/www/first2023/wp-content/themes/firstweekly/comments.php on line 48
You must be logged in to post a comment Login